+86-13571793445       selina@rxwirelinetools.com
You are here: Home » Products » Pressure Control Equipment » Slickline Blowout Preventer BOP

loading

Share to:

Slickline Blowout Preventer BOP

Blow out Preventer (BOP), which is connected to the top of the wellhead joint or Christmas tree. When the steel wire or cable is still downhole, closing the blowout preventer can seal around the steel wire, seal the pressure in the well, and prevent external blowout.
Availability:
  • FZ7.6-35-Y
  • Ruixin
  • Slickline Blowout Preventer BOP
  • Alloy Steel&Nickel Alloy
  • China Baoji
  • Wireline & Slickline
  • Standard

Slickline Blowout Preventer BOP Manufacturer - Ruixin

Blow out Preventer (BOP), which is connected to the top of the wellhead joint or Christmas tree. When the steel wire or cable is still downhole, closing the blowout preventer can seal around the steel wire, seal the pressure in the well, and prevent external blowout.

Slickline Blowout Preventer BOP The main technical parameters

1. Specification model: FZ7.6-35-Y

2. Rated working pressure: 35MPa;

3. Strength test pressure: 52MPa;

4. Maximum applicable wire diameter: 0.125″;

5. Through hole diameter: Φ76.2mm(3");

6. Operation mode: hydraulic control;

7. Connection form: 4-3/4″-4ACME•B;

Slickline Blowout Preventer BOP Product test

1. Strength test:

(1). Install the pressure test connector and connect the pressure test pipeline;

(2). Start the pressure test pump to carry out the pressure test, the test pressure is 52MPa, the pressure is maintained for 15 minutes, and the test record card is filled in.

2. Performance test:

(1). Manually close the gate, and clamp the 0.125" diameter polished rod in the sealing groove in the gate;

(2). Remove the upper and lower pressure test joints, press from the 1/2 plug of the lower wing to 35 MPa, keep the pressure for 30 minutes, and fill in the test record card.

(3) After the test, clean up the residual moisture inside.

Slickline Blowout Preventer BOP Notes

1. Check the inner and outer seals and O-rings of the gate in time, and replace them in time;

2. After each maintenance, a performance test (gate seal test) should be done;

3. Regular strength test and sealing test.



Previous: 
Next: