Wireline Tee Joint

The Wireline Tee joint is attached below the BOP,The Wireline Pumping tee connection thread is used to connect the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the tee body is a pressure release valve . After installing the pressure release valve, it can be used for pressure relief to ensure safe operation.
Availability:
  • 2.5inch - 5inch

  • Ruixin

  • Wireline Tee Joint

  • Alloy Steel&Nickel Alloy

  • China Baoji

  • Wireline & Slickline

  • Standard

Wireline Tee Joint Manufacturer - Ruixin

The Wireline Tee joint is attached below the BOP,The Wireline Pumping tee connection thread is used to connect the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the tee body is a pressure release valve . After installing the pressure release valve, it can be used for pressure relief to ensure safe operation.

Wireline Tee Joint General Technical Parameters

Size/mm

work pressure /MPa

Connection

2.5inch

35/70

4-3/4-4ACME·B type

3inch

35/70

5-3/4-4ACME·O type

4inch

35/70

8-3/8-4ACME·O type

5inch

35/70

9-4ACME·O type

Wireline Tee Joint Pressure Testing

1. Install the pressure test connector and connect the pressure test line;
2. Start the pressure test pump to carry out the pressure test. Refer to the specific specifications and
drawings for the test pressure and time. Fill in the test record card.

Wireline Tee Joint Daily Maintenance

1.After use, the O-ring and seal should be replaced;
2.When not in use, should take the protector and brush the thread with anti-rust oil for storage.